Certification: | CE |
---|---|
Place Style: | Horizontal |
Range of Applications: | Industrial |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
550c Electric Heating Aluminum Alloy T6 Furnace for Aluminum Alloy Workpiece Heat Treatment T6
The aluminum alloy solution furnace is composed of furnace shell, furnace lining, heating system, circulating fan, deflector plate, basket lifting mechanism, furnace door and mobile pressing mechanism, mobile quenching water tank, temperature, motion control system, etc., according to Different heating methods can be divided into electric heating and gas heating. They are mainly used for heating and rapid quenching of aluminum alloy parts in small and medium batches. They are widely used in aluminum alloy wheels and engine parts in the automobile and motorcycle industries. Solid solution treatment of automotive superchargers, aviation, aerospace, aluminum alloy rods, tubes, die castings, aluminum castings and various aluminum alloy standard parts, and other aluminum alloy parts.
Model | Chamber Size | Rated Power | Rated Temperature | Load Capacity |
(L*W*H)mm | ||||
DM-AASF120 | φ1000×2500 | 120Kw | 650C | 2200Kg |
DM-AASF150 | φ1000×3000 | 150Kw | 650C | 2500Kg |
DM-AASF140 | 1200×1200×1400 | 140Kw | 650C | 2200Kg |
DM-AASF180 | 1500×1500×2000 | 180Kw | 650C | 4000Kg |
DM-AASF280 | 2000×2000×3000 | 280Kw | 650C | 6000Kg |
DM-AASF300 | 2200×2200×3000 | 300Kw | 650C | 2000Kg |
Can Be Customized |
Q1. How is your company's product after-sales service system?
A. We have professional pre-sales and after-sales departments and
can respond to you within 8 hours to resolve any technical issues.
Q2. How about the quality guarantee period?
A:2 years, exclude irrationally operating and consumable parts.
Q3. How about your products quality?
CE certification available and twice test before shipping.
Q4. What's your delivery time?
90 days
Q5. Are you a manufacturer or a trading company?
We are a factory with 10 years experience in the field.
Suppliers with verified business licenses